Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
50 FT RG11...1$35.00
Dual Side Arm...2$159.95
ROHN Tower...1$63.00
20 Foot Telescopic...1$158.00
ROHN 18 inch...1$86.00
50 Foot Telescopic...2$325.00
4 inch Heavy...1$11.95
PPC AquaTight...1$2.95
225 FT RG11...3$99.00
ROHN 25G Adjustabl...1$203.00
618 Telescopic...1$10.95
Telescopic...10$164.00
ROHN EP25343...2$86.00
ROHN 25G 40...1$1,639.00
Cat6 UTP 550...1$1.70
4 inch W type...1$10.95
12 inch Telescopic...1$23.50
ROHN 4 inch...1$39.00
EZ TM-50-U...1$164.00
ROHN 25G Thrust...1$78.00
7 Inch Cable...1$2.50
Commscope 2...1$1.25
75 FT RG11...1$45.00
40 Foot Telescopic...1$240.00
3 inch wall...3$12.95
EZ19B Roof...1$18.08
RG11 RG7 RG6...1$12.95
24 inch Deluxe...1$34.95
5' Foot X 1...1$16.30
ROHN TUF TUG...1$325.00
EZ32 Telescopic...2$14.95
ROHN 25G 10...1$334.00
ROHN TUF TUG...1$335.00
BNC Male to...1$1.55
RG6 Underground...1$62.00
ROHN 24 inch...1$88.00
HOLLAND 12...1$2.65
Rohn RSL Tower...1$592.00
RASK12 Accessory...1$296.00
Complete Grounding...2$32.00
Rohn RSL RGKG...1$430.00
Rohn RSWGB...1$260.00
21" J Pipe...1$19.95
EZ32C Telescopic...1$24.95
50 Foot Telescopic...1$282.00
HOLLAND 6 dB...1$2.65
ROHN 25G Tower...1$97.00
Rohn RSL Tower...1$60.50
1/4 inch Heavy...1$1.15
EZ TM-30-U...1$112.00
Goods Total68$9,436.08
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info