Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
Complete Grounding...4$32.00
225 FT RG11...1$99.00
12 inch Telescopic...5$23.50
9 dB 2 Port...1$2.89
ROHN TUF TUG...1$325.00
Rohn RSL Tower...3$625.00
Rohn RSL Tower...6$345.00
24 inch Deluxe...4$34.95
PPC EX6 PLUS...1$0.24
ROHN H50 Telescopi...35$189.00
50 Foot Telescopic...3$325.00
ROHN 65G Adjustabl...1$745.00
EZ TM-50-U...11$164.00
ROHN Tower...1$38.00
EZ32 Telescopic...3$14.95
50 Foot Telescopic...8$282.00
ROHN 24 inch...9$88.00
ROHN 45G 10...2$570.00
ROHN Bolt Kit...2$7.50
4 inch Heavy...8$11.95
Rohn RSL Tower...9$1,540.00
18 inch Telescopic...4$28.40
Rohn RSL Tower...7$60.50
EZ32A Telescopic...1$21.95
ROHN 18 inch...7$86.00
53" X 2.00"...3$17.95
ROHN 4 inch...7$39.00
Rohn RSL RGKG...3$430.00
ROHN RSL TOWER...4$33.00
5' Foot X 1...4$16.30
Rohn RSL Tower...4$1,345.00
ROHN 65G 40...1$5,090.00
Telescopic...40$164.00
ROHN BGK2G...1$89.00
ROHN RSL 100...1$6,400.00
50 FT RG11...2$35.00
Rohn RSL Tower...5$196.00
Rohn RSL Tower...7$1,150.00
ROHN 18 inch...2$47.00
Rohn RSL Tower...6$310.00
Broadband Digital...2$26.95
ROHN Universal...3$70.38
Rohn RSL Tower...6$3,710.00
Dual Port Coaxial...1$1.30
30 Foot Telescopic...1$166.00
Dual Port Coaxial...1$1.65
Rohn RSL Tower...4$156.00
30 inch Telescopic...5$24.95
24 dB 2 Port...1$2.89
RG6 Coaxial...2$3.95
ROHN 25G Complete...1$4,480.00
8' Foot X 1...3$27.00
EZ19B Roof...1$18.08
ROHN 45G 30...1$1,260.00
Rohn RSL Tower...5$592.00
Rohn RSWGB...4$260.00
Rohn RSL Tower...3$372.00
TTRSL50 Safety...1$580.00
RG11 Quad Shield...1$185.00
ROHN 25AG 45AG...3$49.00
Thomas and...1$0.35
ROHN TUF TUG...6$335.00
ROHN 25G 10...1$156.00
ROHN RSL 100...3$6,636.00
EZ32C Telescopic...4$24.95
20 Foot Telescopic...1$126.00
EZ30 30" Single...1$17.95
DS-3000 J Pipe...1$28.95
PPC Single...2$1.25
Rohn RSL Tower...5$58.00
Holland TSTL...1$24.95
RASK12 Accessory...5$296.00
ROHN 65G Section...1$84.95
ROHN RSL 100...4$6,090.00
Gripple 1/8"...1$6.25
8 inch TV Antenna...1$13.90
Dual Port Coaxial...2$1.35
ROHN Lightning...6$145.00
Adjustable...1$8.95
ROHN 12 inch...3$84.00
ROHN 65g Top...1$319.95
#12 Solid Copper...1$24.95
ROHN 45G Tower...1$162.00
ROHN 25G Tower...1$97.00
ROHN 25G Complete...2$4,480.00
CAT6 Direct...1$300.38
EZ TM-20-U...1$83.00
CAT6 Direct...1$249.95
ROHN 55G Tower...1$1,350.00
ROHN Universal...1$595.00
ROHN 65G 10...1$1,695.00
5' Foot by...1$14.95
HOLLAND HFS...1$2.50
PPC EX6XL PLUS...1$0.26
ROHN 8 inch...3$79.00
75 FT RG11...1$45.00
LNS5000 Big...1$67.95
ROHN Lightning...2$69.00
Telescopic...5$117.00
3/8 X 4 Foot...1$16.00
ROHN 65G 10...2$1,250.00
ROHN 65G 20...1$1,668.00
ROHN 65G 50...1$6,607.00
ROHN 55G 40...1$2,005.00
ROHN 55G Tower...1$298.00
ROHN H30 Telescopi...1$22.95
TTRSL100 Safety...3$850.00
ROHN 45G Tower...1$204.00
EZ48 48" Single...1$32.95
PLA1000 F Connecto...1$49.95
ROHN 25G Antenna...1$415.00
ROHN 45G/55G...1$558.00
45G Main Straight...1$13.95
ROHN 55G Tower...1$332.00
24 inch Telescopic...1$34.75
ROHN 65G Tower...1$1,350.00
APICA AP-RCA...1$1.39
ROHN 45G 40...1$1,605.00
Goods Total375$190,941.67
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info