Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
ROHN Universal...1$695.00
ROHN H40 Telescopi...15$163.00
ROHN 24 inch...6$88.00
8' Foot X 1...1$27.00
ROHN 25AG 45AG...1$49.00
DS-3000 J Pipe...2$28.95
ROHN 18 inch...6$86.00
20 Foot Telescopic...2$126.00
ROHN Universal...4$70.38
ROHN 4 inch...6$39.00
ROHN 65G Tower...1$1,350.00
ROHN 12 inch...5$84.00
ROHN Bolt Kit...1$7.50
ROHN BGK2G...3$89.00
Holland TSTL...1$24.95
100 FT RG11...4$55.00
20 Foot Telescopic...1$158.00
ROHN 65g Top...1$319.95
ROHN 65G Adjustabl...1$745.00
40 Foot Telescopic...2$309.00
Power Passing...1$4.95
ROHN 25G 35...1$897.00
Telescopic...5$144.00
24 inch Telescopic...2$34.75
40 Foot Telescopic...1$240.00
10' Foot X...2$27.95
EZ32A Telescopic...2$21.95
ROHN 25G Tower...1$184.00
ROHN 25G Tower...1$101.00
5' Foot X 1...2$16.00
30 Foot Telescopic...2$166.00
ROHN 25G Tower...1$1,985.00
ROHN 25G 45G...1$318.00
18 inch Telescopic...5$28.40
30 inch Telescopic...8$24.95
5/8 X 10 Foot...1$28.95
Complete Grounding...3$32.00
ROHN 55G Assembly...1$357.00
12 inch Telescopic...5$23.50
50 FT RG11...1$35.00
Rohn RSL Tower...3$156.00
ROHN TUF TUG...1$325.00
ROHN H50 Telescopi...15$189.00
PPC EX6WS AquaTigh...2$0.28
Rohn RSL Tower...3$625.00
Rohn RSWGB...7$260.00
50 Foot Telescopic...2$282.00
Heavy Duty...1$18.95
RG6 Coaxial...1$4.95
ROHN RSL 100...5$6,090.00
Rohn RSL Tower...5$310.00
Rohn RSL Tower...2$196.00
ROHN 8 inch...1$79.00
ROHN 65G Tower...2$390.00
4 inch Heavy...2$11.95
5' Foot X 1...4$16.30
24 inch Deluxe...4$34.95
HOLLAND 2-Way...1$1.60
Rohn RSL Tower...2$592.00
EZ32C Telescopic...5$24.95
EZ32 Telescopic...2$14.95
ROHN RSL 100...4$6,636.00
Mastic Sealing...1$1.95
Rohn RSL Tower...3$3,710.00
Rohn RSL Tower...1$58.00
ROHN 25G Tower...1$205.00
EZ TM-50-U...1$164.00
Rohn RSL Tower...3$372.00
Rohn RSL Tower...1$1,150.00
Rohn RSL Tower...5$1,540.00
ROHN TUF TUG...3$335.00
ROHN 25G Top...1$298.00
ROHN 55G 20...1$1,405.00
TTRSL100 Safety...4$850.00
Rohn RSL Tower...3$1,345.00
225 FT RG11...4$99.00
ROHN 25G Tower...1$310.00
EZ19B Roof...1$18.08
ROHN 55G Tower...1$298.00
50 Foot Telescopic...2$325.00
ROHN 25G Accessory...1$74.00
EZ46-3 Pitch...2$3.95
ROHN 25G 20...1$540.00
ROHN 65G 30...1$3,406.00
Heavy Duty...1$129.95
EZ TM-30-U...1$112.00
ROHN 65G Tower...1$780.00
Non-Penetrating...1$131.00
ROHN Lightning...1$69.00
In-Line Cable...1$32.95
ROHN 25G Complete...1$4,480.00
30 Foot Telescopic...1$206.00
Rohn RSL Tower...2$60.50
ROHN Lightning...4$145.00
ROHN 25G Tower...1$97.00
Telescopic...5$164.00
PPC EX6XL PLUS...1$0.26
ROHN RSL TOWER...1$33.00
ROHN 25G 10...1$156.00
PPC AquaTight...1$2.95
ROHN 65G 20...1$2,600.00
4 inch W type...1$10.95
Rohn RSL RGKG...1$430.00
ROHN TB5125BA...1$35.23
1/8" Down...1$0.95
ROHN 25G Tower...1$335.00
ROHN 45G Self...1$595.00
ROHN 25G 10...1$334.00
RG6 Underground...1$34.00
Broadband Digital...1$26.95
8' Foot X 1...1$27.95
ROHN 65G 10...1$1,908.00
53" X 2.00"...1$17.95
75 FT RG11...1$45.00
Goods Total264$135,970.75
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info