Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
Rohn RSL RGKG...1$430.00
ROHN 18 inch...3$86.00
50 Foot Telescopic...1$325.00
4 inch Heavy...3$11.95
5' Foot X 1...2$16.30
EZ32A Telescopic...3$21.95
PPC Single...1$1.25
ROHN 25G 50...1$1,790.00
Rohn RSL Tower...2$592.00
24 inch Telescopic...2$34.75
ROHN H50 Telescopi...15$189.00
RG11 RG7 RG6...1$12.95
Rohn RSL Tower...1$3,710.00
ROHN 25G Side...1$43.00
Rohn RSL Tower...1$310.00
Rohn RSL Tower...2$345.00
Rohn RSL Tower...1$625.00
12 dB 2 Port...1$2.89
5' Foot X 1...2$16.00
EZ32 Telescopic...1$14.95
ROHN 12 inch...2$84.00
Rohn RSL Tower...1$372.00
ROHN RSL 100...1$6,090.00
225 FT RG11...2$99.00
EZ32C Telescopic...1$24.95
Rohn RSL Tower...1$1,540.00
Rohn RSL Tower...1$1,345.00
Complete Grounding...1$32.00
ROHN 65G 10...1$1,908.00
ROHN 65G 20...1$3,582.00
FAM-12HR 12...25$2.45
50 FT RG11...1$35.00
ROHN TUF TUG...1$325.00
Rohn RSL Tower...1$60.50
Heavy Duty...1$22.95
ROHN 65G Tower...1$665.00
ROHN 65G 40...1$5,090.00
24 inch Deluxe...1$34.95
ROHN 4 inch...1$39.00
6 inch TV Antenna...1$10.82
PPC EX6WS AquaTigh...1$0.28
ROHN 65G 10...1$1,250.00
Goods Total93$35,322.54
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info