Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
12 inch Telescopic...3$23.50
Rohn RSL Tower...4$156.00
EZ46-3PO Pitch...1$1.90
Rohn RSL Tower...1$3,710.00
ROHNJACK G...1$329.00
ROHN H50 Telescopi...15$189.00
EZ TM-50-U...1$164.00
Rohn RSWGB...2$260.00
ROHN 65G 40...1$5,090.00
Rohn RSL Tower...1$1,345.00
TTRSL100 Safety...1$850.00
Rohn RSL RGKG...2$430.00
Rohn RSL Tower...1$310.00
Rohn RSL Tower...3$345.00
ROHN Tower...1$38.00
75 Ohm F Port...25$0.45
LNS5000 Big...1$67.95
ROHN 45G Tower...1$162.00
ROHN 45G 45...1$2,150.00
ROHN 24 inch...3$88.00
4 inch Heavy...1$11.95
18 inch Telescopic...1$28.40
Rohn RSL Tower...1$60.50
Complete Grounding...2$32.00
ROHN 25G Complete...1$3,340.00
ROHN 25G 45G...1$316.00
Rohn RSL Tower...3$1,540.00
24 inch Telescopic...1$34.75
Rohn RSL Tower...1$58.00
3/8 X 4 Foot...1$16.00
ROHN 25G Tower...1$260.00
ROHN 55G Tower...1$332.00
ROHN RSL 100...2$6,090.00
30 inch Telescopic...2$24.95
50 Foot Telescopic...1$325.00
Thomas and...1$4.90
Rohn RSL Tower...1$592.00
ROHN 45G 20...1$915.00
ROHN 8 inch...2$79.00
5' Foot X 1...1$16.30
100 FT RG11...1$55.00
75 FT RG11...1$45.00
Rohn RSL Tower...1$196.00
5/8 X 4 Foot...1$19.95
ROHN 25G Adjustabl...1$203.00
EZ TM-30-U...1$112.00
Goods Total101$44,451.25
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info