Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
75 FT RG11...1$45.00
Rohn RSL Tower...1$3,710.00
Rohn RSL Tower...3$1,345.00
EZ32 Telescopic...1$14.95
Rohn RSL Tower...3$156.00
Rohn RSL Tower...1$372.00
Rohn RSL Tower...1$1,540.00
PPC AquaTight...1$2.95
50 Foot Telescopic...1$325.00
24 inch Deluxe...2$34.95
Rohn RSL Tower...2$345.00
ROHN 18 inch...2$86.00
RASK12 Accessory...1$296.00
ROHN Lightning...1$69.00
ROHN RSL TOWER...3$33.00
18 inch Telescopic...2$28.40
EZ32A Telescopic...2$21.95
ROHN TUF TUG...2$335.00
Rohn RSL Tower...1$310.00
ROHN TUF TUG...1$325.00
Rohn RSWGB...1$260.00
ROHN RSL 100...1$6,400.00
Rohn RSL Tower...2$625.00
100 FT RG11...1$55.00
BNC Male to...1$1.55
ROHN 24 inch...1$88.00
PPC Single...1$1.25
TTRSL50 Safety...1$580.00
ROHN 8 inch...1$79.00
Rohn RSL Tower...1$58.00
ROHN 25G Tower...1$97.00
ROHN 65G Section...1$84.95
ROHN 45G 55G...1$156.00
EZ32C Telescopic...2$24.95
18 inch Deluxe...1$26.95
ROHN RSL 100...1$6,636.00
ROHN 12 inch...2$84.00
50 FT RG11...2$35.00
ROHN 25G Thrust...1$78.00
50 Foot Telescopic...1$282.00
ROHN RSL 100...1$6,090.00
Rohn RSL Tower...1$196.00
ROHN Lightning...1$145.00
ROHN 4 inch...1$39.00
ROHN 45G 55G...1$290.00
RG6 Underground...1$34.00
5' Foot X 1...1$16.30
Goods Total63$36,546.40
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info