Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
Rohn RSL Tower...7$1,150.00
TTRSL100 Safety...8$850.00
ROHN 45G 30...1$1,260.00
Rohn RSL Tower...5$1,540.00
Rohn RSL Tower...5$372.00
ROHN 4 inch...3$39.00
ROHN 18 inch...2$86.00
9 dB 2 Port...1$2.89
Complete Grounding...5$32.00
18 inch Telescopic...7$28.40
4 inch Heavy...12$11.95
Rohn RSWGB...6$260.00
12 inch Telescopic...9$23.50
ROHN 65G 10...2$1,695.00
ROHN 25G Accessory...1$74.00
ROHN Lightning...7$145.00
ROHN 18 inch...2$47.00
24 inch Deluxe...6$34.95
EZ32C Telescopic...6$24.95
225 FT RG11...4$99.00
Rohn RSL Tower...4$310.00
50 Foot Telescopic...3$325.00
30 inch Telescopic...4$24.95
Rohn RSL Tower...5$1,345.00
ROHN RSL 100...5$6,090.00
ROHN 65G Tower...1$390.00
24 inch Telescopic...2$34.75
EZ TM-50-U...4$164.00
5' Foot X 1...7$16.30
EZ32A Telescopic...6$21.95
Rohn RSL Tower...1$196.00
BNC Female...1$1.10
50 FT RG11...1$35.00
RG6 Coaxial...1$6.95
618 Telescopic...1$10.95
EZ32 Telescopic...5$14.95
618 Telescopic...1$134.00
Rohn RSL Tower...3$3,710.00
125 FT RG11...8$59.00
EZ60 620 Plastic...1$7.95
ROHN 25G Thrust...1$78.00
ROHN TUF TUG...1$325.00
Rohn RSL Tower...8$592.00
ROHN TUF TUG...7$335.00
EZ46-3 Pitch...1$3.95
50 Foot Telescopic...9$282.00
ROHN RSL 100...4$6,636.00
ROHN 25G Top...1$264.00
Telescopic...35$164.00
ROHN Bolt Kit...1$7.50
30 Foot Telescopic...1$206.00
ROHN 65G 10...1$1,908.00
Rohn RSL Tower...8$60.50
Rohn RSL Tower...5$625.00
Rohn RSL RGKG...6$430.00
ROHN 45G/55G...1$558.00
75 FT RG11...2$45.00
21" J Pipe...1$19.95
ROHN 12 inch...6$84.00
ROHN 8 inch...1$79.00
EZ19B Roof...4$18.08
HOLLAND 12...2$2.65
DS-3000 J Pipe...1$28.95
BNC Male to...1$1.55
RASK12 Accessory...7$296.00
RG11 RG7 RG6...2$12.95
EZ TM-30-U...1$112.00
Rohn RSL Tower...6$58.00
Telescopic...5$117.00
ROHN Universal...5$70.38
53" X 2.00"...3$17.95
ROHN H50 Telescopi...35$189.00
Heavy Duty...1$9.95
Rohn RSL Tower...3$345.00
Coaxial Cable...1$1.95
Rohn RSL Tower...4$156.00
RG6 Coaxial...2$3.95
ROHN 25G Side...1$43.00
ROHN 65G 20...1$3,582.00
ROHN 65G Tower...1$1,350.00
5' Foot X 1...2$16.00
Dual Port Coaxial...1$1.35
ROHN Tower...1$38.00
Thomas and...1$0.35
57" Inch X...1$18.95
100 FT RG11...2$55.00
ROHN 55G 40...1$2,005.00
ROHN 25G Tower...2$1,985.00
ROHN 65G 35...1$4,836.00
EZ46-3PO Pitch...1$1.90
ROHN 24 inch...6$88.00
4 inch W type...1$10.95
RG6 RG59 RG58...1$8.95
ROHNJACK G...1$329.00
ROHN 25G 35...1$897.00
ROHN 45G 55G...1$290.00
DC Voltage...2$1.95
1/8" Down...1$0.95
ROHN 65G Tower...2$665.00
PPC EX6 PLUS...1$0.24
ROHN 25AG 45AG...1$49.00
12 dB 2 Port...2$2.89
ROHN 25G Tower...1$260.00
Holland HPF...1$2.45
ROHN 25G Complete...1$6,980.00
ROHN 65G 50...1$6,607.00
HOLLAND HFS...1$2.25
ROHN 25G Tower...1$184.00
ROHN 6 inch...1$39.00
ROHN RSL TOWER...2$33.00
36 Inch Roof...1$49.00
RG6 Coaxial...1$5.95
RG6 Coaxial...1$4.95
Dual Port Coaxial...2$1.65
ROHN 45G 40...1$1,605.00
ROHN 55G Tower...1$332.00
ROHN 25G Tower...1$478.00
4 inch TV Antenna...1$12.00
ROHN Tripod...1$284.00
ROHN 25G Anti...1$598.00
ROHN GAS4303...1$33.00
EZ TM-40-U...1$139.95
Goods Total404$187,697.93
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info