Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
EZ32C Telescopic...1$24.95
1/8" Down...1$0.95
EZ32 Telescopic...3$14.95
ROHN 24 inch...2$88.00
Rohn RSL Tower...1$60.50
ROHN Universal...3$70.38
Rohn RSL Tower...2$1,540.00
Rohn RSL Tower...4$58.00
ROHN H50 Telescopi...20$189.00
ROHN TUF TUG...1$325.00
ROHN 25G Tower...1$79.00
4 inch Heavy...1$11.95
ROHN 25G Tower...1$290.00
ROHN 8 inch...4$79.00
ROHN TUF TUG...4$335.00
ROHN 18 inch...1$86.00
9 dB 2 Port...1$2.89
ROHN 65G Tower...1$1,350.00
100 FT RG11...1$55.00
ROHN 25G 10...1$156.00
Rohn RSL Tower...3$1,345.00
ROHN 12 inch...2$84.00
ROHN 25G 45G...1$318.00
Rohn RSWGB...2$260.00
ROHN RSL 100...1$6,636.00
Rohn RSL Tower...2$345.00
EZ48 48" Single...1$32.95
12 inch Telescopic...1$23.50
EZ DM 166-2...1$17.95
ROHN 25G 45G...1$210.00
ROHN 25G Tower...2$166.00
6in x 66in...1$49.95
Heavy Duty...1$39.95
24 inch Deluxe...1$34.95
EZ46-3 Pitch...1$3.95
EZ32A Telescopic...2$21.95
125 FT RG11...3$59.00
RG6 Coaxial...1$3.95
Rohn RSL Tower...1$1,150.00
Rohn RSL Tower...1$3,710.00
75 FT RG11...1$45.00
LNS5082 RG6...1$27.95
Complete Grounding...1$32.00
Rohn RSL Tower...1$196.00
Non-Penetrating...1$131.00
Rohn RSL Tower...2$625.00
18 inch Telescopic...1$28.40
50 Foot Telescopic...1$282.00
LNS5000 Big...2$67.95
ROHN RSL TOWER...2$33.00
30 inch Telescopic...1$24.95
ROHN Lightning...1$145.00
ROHN 25G Accessory...1$74.00
Rohn RSL RGKG...2$430.00
HOLLAND LA...1$11.95
Tower Side...1$139.95
TTRSL100 Safety...2$850.00
ROHN 25G 40...1$865.00
ROHN RSL 100...1$6,090.00
TTRSL50 Safety...1$580.00
3 Foot Roof...1$54.00
225 FT RG11...1$99.00
Goods Total110$42,657.38
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info