Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
ROHN RSL 100...1$6,090.00
50 FT RG11...2$35.00
Dual Port Coaxial...1$1.65
EZ TM-50-U...5$164.00
ROHN Universal...3$70.38
ROHN 18 inch...1$86.00
24 inch Deluxe...2$34.95
Rohn RSWGB...2$260.00
50 Foot Telescopic...4$282.00
EZ46-3 Pitch...1$3.95
ROHN RSL TOWER...1$33.00
Rohn RSL RGKG...2$430.00
EZ32 Telescopic...2$14.95
ROHN 24 inch...2$88.00
Complete Grounding...2$32.00
Rohn RSL Tower...1$196.00
ROHN 4 inch...2$39.00
ROHN 12 inch...1$84.00
ROHN 65G Section...1$84.95
18 inch Telescopic...3$28.40
EZ32C Telescopic...1$24.95
5' Foot X 1...1$16.30
ROHN Tower...1$38.00
ROHN 25G 5...1$165.00
ROHN Lightning...1$145.00
ROHN RSL 100...2$6,636.00
BNC Male to...2$1.55
ROHN 12 inch...1$45.00
ROHN Lightning...1$69.00
30 Foot Telescopic...1$166.00
Rohn RSL Tower...1$310.00
Rohn RSL Tower...1$1,540.00
4 inch Heavy...3$11.95
100 FT RG11...1$55.00
3 Foot Tripod...1$31.50
Rohn RSL Tower...1$345.00
225 FT RG11...2$99.00
EZ32A Telescopic...1$21.95
ROHN 45G 40...1$1,605.00
75 FT RG11...1$45.00
MCR 4-Way Horizont...1$4.60
RG11 RG7 RG6...1$12.95
Rohn RSL Tower...1$1,150.00
EZ TS-50 Free...1$69.95
50 Foot Telescopic...1$325.00
12 inch Telescopic...2$23.50
ROHN 8 inch...1$79.00
ROHN 25G Tower...1$298.00
ROHN H20 Telescopi...10$75.00
HOLLAND 20...1$2.65
ROHN 65G Tower...1$734.00
Goods Total85$32,296.49
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info