Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
8' Foot X 1...1$27.95
ROHN 25G Tower...2$289.00
EZ19B Roof...1$18.08
500 FT RG11...1$134.95
24 inch Deluxe...1$34.95
ROHN 25G Tower...1$369.00
ROHN 25G Tower...1$205.00
ROHN 65G 40...1$5,090.00
ROHN 25G Tower...1$995.00
Complete Grounding...2$32.00
ROHN 25G Assembly...1$186.00
EZ32C Telescopic...2$24.95
HOLLAND 12...1$2.65
ROHN 45G Complete...1$8,295.00
ROHN 24 inch...3$88.00
ROHN Universal...1$70.38
20 Foot Telescopic...1$158.00
30 inch Telescopic...1$24.95
ROHN 25G 20...1$540.00
4 inch W type...1$10.95
ROHN 25G Tower...1$985.00
24 inch Telescopic...1$34.75
ROHN 25G Universal...1$128.00
ROHN 4 inch...2$39.00
1/4 inch Heavy...1$1.15
EZ TM-50-5U...1$115.00
3 Foot Tripod...1$31.50
75 FT RG11...2$45.00
ROHN 25G Tower...1$478.00
225 FT RG11...1$99.00
3/16" Extra...1$110.00
ROHN 65G 10...1$1,695.00
ROHN Leg Mounted...1$165.00
30 Foot Telescopic...1$166.00
ROHN 65G Tower...1$780.00
18 inch Telescopic...1$28.40
ROHN H20 Telescopi...5$75.00
3/16" Down...1$0.99
ROHN H50 Telescopi...5$189.00
Telescopic...5$117.00
3/16" Extra...1$179.95
30 Foot Telescopic...1$206.00
Rohn RSL Tower...1$592.00
EZ TM-40-U...1$139.95
Goods Total63$25,127.45
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info