Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
ROHN 4 inch...2$39.00
HDG 14 Gauge...1$19.95
ROHN 24 inch...2$88.00
Rohn RSL Tower...1$1,150.00
Complete Grounding...1$32.00
ROHN 65G 10...1$1,908.00
30 inch Telescopic...3$24.95
EZ32A Telescopic...5$21.95
EZ TS-50 Free...1$69.95
EZ19B Roof...1$18.08
4 inch Heavy...2$11.95
ROHN 8 inch...1$79.00
2 Cat6, 2 Quad...1$660.83
Rohn RSL Tower...2$1,540.00
ROHN 12 inch...2$84.00
EZ32 Telescopic...1$14.95
Rohn RSL Tower...2$345.00
18 inch Telescopic...1$28.40
ROHN RSL 100...2$6,090.00
Rohn RSL Tower...1$58.00
ROHN Lightning...1$145.00
225 FT RG11...1$99.00
Rohn RSL Tower...1$60.50
EZ60A 620 Steel...1$6.95
TTRSL100 Safety...1$850.00
50 Foot Telescopic...1$282.00
Rohn RSL Tower...1$625.00
12 inch Telescopic...1$23.50
EZ32C Telescopic...1$24.95
RASK12 Accessory...1$296.00
ROHN BGK2G...1$89.00
ROHN TUF TUG...1$325.00
EZ46-3 Pitch...1$3.95
Rohn RSL Tower...1$196.00
50 FT RG11...1$35.00
Goods Total48$23,681.51
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info