Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
ROHN Universal...1$595.00
75 FT RG11...9$45.00
12 inch Telescopic...14$23.50
ROHN 25G 35...1$897.00
EZ19A Roof...2$12.85
Telescopic...5$144.00
ROHN 65G Tower...1$665.00
ROHN 12 inch...7$84.00
Complete Grounding...7$32.00
ROHN Bolt Kit...2$7.50
ROHN 25G 45G...1$318.00
50 Foot Telescopic...3$325.00
ROHN 55G Top...1$425.00
30 inch Telescopic...9$24.95
ROHN 4 inch...2$39.00
BNC Male to...1$3.00
Thomas & Betts...1$0.36
4 inch Heavy...8$11.95
24 inch Telescopic...4$34.75
ROHN 55G Assembly...1$357.00
EZ19B Roof...5$18.08
ROHN Lightning...4$145.00
40 Foot Telescopic...1$309.00
ROHN 65G Adjustabl...1$745.00
EZ46-3PO Pitch...2$1.90
Hinged Wall...1$20.00
ROHN H20 Telescopi...5$75.00
BNC Male to...1$4.95
Rohn RSL Tower...3$372.00
EZ32C Telescopic...6$24.95
ROHN 45G 20...1$915.00
Rohn RSL Tower...4$625.00
Rohn RSL Tower...8$592.00
5' Foot X 1...6$16.30
50 Foot Telescopic...3$282.00
RASK12 Accessory...3$296.00
Rohn RSL RGKG...5$430.00
53" X 2.00"...2$17.95
50 FT RG11...5$35.00
EZ32 Telescopic...4$14.95
ROHN BGK2G...1$89.00
Rohn RSL Tower...5$345.00
EZ32A Telescopic...6$21.95
Heavy Duty...1$24.95
ROHN 45G Self...1$595.00
Telescopic...30$164.00
Rohn RSL Tower...5$1,345.00
ROHN Universal...8$70.38
Tower Side...1$139.95
ROHN 25G Tower...1$335.00
ROHN TUF TUG...4$335.00
Rohn RSL Tower...1$196.00
TTRSL100 Safety...3$850.00
ROHN H50 Telescopi...20$189.00
Rohn RSL Tower...10$1,150.00
4 inch W type...1$10.95
18 inch Telescopic...3$28.40
ROHN 45G 40...2$1,605.00
ROHN 25G Antenna...1$415.00
ROHN 8 inch...5$79.00
#12 Solid Copper...1$24.95
Rohn RSL Tower...9$58.00
EZ TM-50-U...7$164.00
Rohn RSL Tower...3$3,710.00
ROHN TUF TUG...1$325.00
Channel Master...1$1.40
LNS5082 RG6...1$27.95
HOLLAND 9 dB...1$2.65
ROHN RSL 100...3$6,090.00
Rohn RSL Tower...4$310.00
Rohn RSL Tower...5$156.00
125 FT RG11...3$59.00
EZ TS-50 Free...1$69.95
Aluminum Mast...1$68.00
ROHN RSL TOWER...2$33.00
DS-3000 J Pipe...3$28.95
ROHN 45G 55G...2$745.00
ROHN 12 inch...1$45.00
1/8" Down...1$0.95
ROHN 25G Tower...1$310.00
Rohn RSL Tower...1$1,540.00
3 inch wall...1$12.95
CAT6 Plenum...1$310.50
Rohn RSL Tower...1$60.50
HOLLAND 16...1$2.65
ROHN 25G Tower...1$358.00
RG6 Underground...1$70.00
Gripple Tensioning...1$87.00
FAM-12HR 12...25$2.45
36 Inch Roof...1$49.00
ROHN Tower...1$38.00
ROHN 18 inch...2$86.00
ROHN 24 inch...1$48.00
ROHN 25G 10...2$156.00
Dual Port Coaxial...1$1.35
Thomas and...1$0.35
Mastic Sealing...1$1.95
PPC EX6WS AquaTigh...1$0.28
100 FT RG11...2$55.00
RG6 Coaxial...1$12.95
In-Line Cable...1$32.95
8 inch Deluxe...1$16.95
ROHN 65G Section...1$84.95
ROHN 65G 20...2$3,582.00
ROHN 55G Tower...2$298.00
Heavy Duty...1$16.95
RG6 Underground...1$38.00
ROHN 25G Accessory...1$74.00
ROHN RSL 100...2$6,636.00
HOLLAND HDA...1$189.95
ROHN 25G 40...2$865.00
ROHN 24 inch...2$88.00
Concrete Base...1$14.95
Rohn RSWGB...2$260.00
225 FT RG11...1$99.00
ROHN 65G Tower...1$1,350.00
ROHN 8 inch...1$47.00
3 dB Power...1$3.65
PLA1000 F Connecto...1$49.95
20 Foot Telescopic...1$126.00
ROHN 65G 35...1$4,836.00
EZ TM-50-5U...1$115.00
Goods Total385$131,195.08
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info