Towers | Poles | Mounts | Masts | Hardware | Guy | Cable | Wire | Carts | Racks | Tools
Your Cart
ProductQtyPrice
ROHN 8 inch...1$79.00
Rohn RSL Tower...2$60.50
ROHN H50 Telescopi...5$189.00
75 FT RG11...2$45.00
ROHN 18 inch...1$47.00
Complete Grounding...2$32.00
ROHN 4 inch...1$39.00
ROHN 65G Tower...1$780.00
Rohn RSL Tower...1$1,150.00
4 inch Heavy...1$11.95
ROHN 12 inch...2$84.00
ROHN TUF TUG...1$325.00
Rohn RSL Tower...1$372.00
Rohn RSL Tower...2$592.00
Rohn RSL Tower...1$196.00
Rohn RSL Tower...1$1,540.00
EZ32 Telescopic...2$14.95
RG6 Coaxial...1$6.95
EZ TM-50-U...1$164.00
12 inch Telescopic...1$23.50
Adjustable...1$8.95
ROHN 55FK 40...1$8,200.00
EZ32C Telescopic...1$24.95
Push on F Connector...1$0.79
8 inch TV Antenna...1$13.90
EZ60A 620 Steel...1$82.95
TTRSL100 Safety...1$850.00
125 FT RG11...1$59.00
12 inch Deluxe...1$19.95
50 Foot Telescopic...1$282.00
EZ46-3 Pitch...1$3.95
24 inch Deluxe...1$34.95
Rohn RSL Tower...1$310.00
50 FT RG11...1$35.00
Goods Total44$17,262.69
View Cart Check out

Telescopic Mast Installation Guide

Printer View Tell a Friend


Telescopic Mast Installation Guide

Assembly

  1. Secure mast base and anchors (sold separately).
  2. Attach lowered mast to base.
  3. Secure guy lines to the lower Guy Ring and attach to anchors. Align the mast vertically by tightening the Guy Lines.
  4. Secure upper Guy Ring using the appropriate mast clamps to desired location on the upper Tube.
  5. Secure appropriate length guy lines to the upper Guy Ring and let them hang.
  6. Raise the upper Tube and inset the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  7. Secure the cotter pin and tighten the mast clamp.
  8. Secure appropriate length guy lines to the next highest Guy Ring, and let them hang.
  9. Raise the next smallest Tube and insert the cotter pin. Make sure that the cotter pin is inside the notch in the inside tube.
  10. Secure the cotter pin and tighten the mast clamp.
  11. Repeat steps 8-10 until all sections have been raised and are secured.
  12. Attach all hanging Guy Lines to their respective anchor. Align the mast vertically by tightening the Guy Lines. Make sure to work your way up the mast while tightening.


Reviews
Rate this article.
Average Customer Rating: 4 based on 1 reviews. Write a review.

 
14 Jun 2018, 9:33 AM
Guss (Guest)
Great
Nice info